Wiring Diagram for Aqua Marine AC 4009-47B with Relay

TURN OFF ALL POWER BEFORE BEGINNING YOUR INSTALLATION

Wiring Diagram for Aqua Marine AC 4009-47B w Relay

Instructions

TURN ALL POWER OFF BEFORE STARTING INSTALLATION.

Route all SoftStart wires into the electrical box. Then crimp Connectors onto all SoftStart wires as indicated in drawing.

Step 1. Follow White Compressor wire from Compressor to the Start Relay. Disconnect it from the Start Relay and cut off its Eye Ring connector. Crimp female connector onto White wire, then connect it to the Blue SoftStart wire. Tape connection with electrical tape.

Step 2. Connect Black SoftStart wire to the terminal that the White Compressor wire was on.

Step 3. Connect Yellow SoftStart wire on terminal next to Black Compressor wire on HERM terminal of Run Capacitor.

Step 4. If you see a Pink wire next to the Black compressor wire on the H terminal, disconnect Pink wire, seal the end with tape and drop it.

Step 5. Follow Purple Compressor wire to the Start Relay. Disconnect it from the Start Relay and cut off its Eye Ring connector. Crimp female connector onto Purple wire, then connect it to the Brown SoftStart wire. Tape connection with electrical tape.

Step 6. Connect Red SoftStart wire onto the terminal that the Purple Compressor wire was on. 

Secure all wires. Tape connections with electrical tape.

Turn Power and A/C Breaker on. Turn A/C to Auto Cool setting and set the thermostat as low as possible.

Look at SoftStart Marine RUN LED light (on left side). Green light should be “on”. Green light means the Compressor is running (there may be a full 3-minute “Test Mode” delay before Green light comes on). IF there is no Green light after 4 minutes, call SoftStart Tech Support for assistance.

After establishing Green light operation, re-install all A/C covers.

Turn A/C on, set near to outdoor temperature and run for 30 minutes. After 30 minutes, operate A/C normally.

If You're Not A SoftStartMarine Owner Yet, Click The Buy Now Button Below For A Special Offer